Berkswell & Balsall RFC was looking to improve the playing surface of its two main pitches to meet Rugby Football Union standards and to resolve...
TTS Solution
With Berkswell & Balsall RFC having secured a grant from Sport England (SE) – which was subsequently matched by the RFU – TTS was appointed to specify and oversee the project from Sport England’s list of approved consultants.
TTS began by conducting an extensive survey of the entire site; taking into account its geomorphology and climate alongside the results of a...
Utilising a grant secured from Sport England, in addition to funds generated through local efforts, the aim of the project was to improve the surface...
TTS Solution
Long Bennington Queen Elizabeth II Playing Field is an existing playing field catering for mainly junior football. TTS began with an extensive on-site survey of the original, over-used 11-a-side pitch; taking into account geographical, geological and environmental factors.
The results illustrated that:
The gradients of the project area both in the line of play and across the line of play were outside...
To improve the playing surface of the club’s main natural turf football pitch, originally installed some 30 years ago on ground formerly occupied by terraced...
TTS Solution
Having secured a grant from Sport England (SE) toward the works, which was then matched by funding from the club itself, SE appointed TTS to oversee the project from its list of approved project managers.
As part of its remit, TTS initially undertook a comprehensive site survey; taking into account the site’s geomorphology and climate, a topographical (levels) survey, electromagnetic inductance...
Design and project management for the construction of multiple non turf sports pitches as part of a £7.8m project to deliver a centre of excellence...
TTS Solution
TTS acted as part of a multi-disciplinary team; its role being to design the artificial sports pitches, provide the relevant plans and specification for tendering of the works and manage the contractors through to completion. Following a site visit in 2008 TTS produced an in-depth feasibility study, including recommendations for future development. A period of consultation followed, with TTS staff...
Reconstruction of cricket table following inundation by the town’s historic flood in 2010.
TTS Solution
Following the worst floods in Cockermouth’s history the town’s cricket club approached the ECB (England & Wales Cricket Board) for advice on reconstructing its ground. TTS and other specialists undertook feasibility studies on the site, with TTS selected for its robust study and quick response in producing the specification and tender documents. TTS managed the entire project; from clearing the...
To produce a One Day International standard ground alongside a second ground with a four pitch square plus non-turf pitch and update practice net facilities...
TTS Solution
TTS was recommended to lead the ground’s design and construction by the International Cricket Council (ICC), which acted in an advisory role, whilst funding for the project included a substantial grant from the Irish government. Set within the historic surrounds of the Malahide Demesne Regional Park, the project was subject to a standing archaeological watch, which resulted in numerous delays...
Design and installation of a new 3G artificial football pitch facility funded by Football Foundation grant.
TTS Solution
TTS was appointed, via Interserve Project Services Ltd, to provide design, specification and project monitoring services for the entire project alongside works to upgrade existing natural pitch surfaces. Before work commenced, TTS provided a full feasibility study in-line with the requirements of the Football Foundation grant aid; including investigations into the existing soil conditions and drainage system, monitoring of electricity...
Development of a One Day International standard ground with 8-pitch square at Moara Vlasiei, 15km outside Bucharest.
TTS Solution
TTS was awarded the contract for consultancy, design and project management on recommendation from ICC (International Cricket Council) Europe and has worked closely with Cricket Romania which co-ordinated the project and local contractors. One of the biggest challenges of the project was to ensure that the contractors responsible for maintaining the ground fully understood the basic cultural practices involved in...
Replace the school’s ageing Redgra athletics track with a new track to conform to UK Athletics performance criteria.
TTS Solution
Designing and installing a state-of-the-art sports facility is one thing. To do so while ensuring it fits seamlessly within a protected historic landscape is quite another. At Stowe School TTS rose to the challenge, with landowner The National Trust consulted on every key decision – from the colour of the track through to the removal of any trees. TTS led...
Following a season that saw the cancellation of some 10 senior, 7 junior and 18 mini matches along with several weekly training sessions due to...
TTS Solution
Having incurred the expense of hiring facilities elsewhere, and also losing revenue from being unable to hold tournaments and events, resolving the root cause of the flooding issue was key to this thriving Cambridgeshire club.
To raise capital, St Ives applied to Sport England’s “pitch protection fund”; putting forward the case to secure funds for the installation of a drainage system...